Asbestos Removal in Durham

Durham is small, with fewer than 1,000 homes, and about 6 in every 10 sit in buildings with five or more units. Under Oregon’s rules those count as commercial buildings, so they need an asbestos survey before renovation whatever their age.

Durham’s demolition permit application asks for the asbestos survey up front. We test and remove asbestos for Durham property owners and managers.

Request a free quote
Two-story 1960s garden apartment building with exterior walkways, wood siding and brick, under an overcast sky

Asbestos services

Apartment testing

A building with five or more units needs a survey before any renovation, whatever year it was built. Asbestos testing covers the units or common areas being changed.

Ceilings in units

An apartment ceiling that tests positive is friable work. We run popcorn ceiling removal in occupied buildings from a sealed work area with warning signs posted at its edge.

Floors between tenants

Turnovers are a good time to replace old flooring. Our floor tile and sheet vinyl removal lifts tile whole and treats any asbestos-backed sheet goods as friable.

Durham demolition permits

Durham’s structural demolition application notes that DEQ requires an asbestos survey before any building is demolished or intentionally burned. The application must include a copy of the survey, or DEQ verification that asbestos removal has been completed and approved.

One of the permit conditions goes a step further: the city wants DEQ’s asbestos abatement report on file before the demolition permit is issued.

Rented homes

About two thirds of Durham’s homes are rented. A landlord can’t use the owner-occupant exemption, so asbestos work in a rental follows the full survey, notice and disposal rules.

Old white wrapped HVAC duct and heat register boot in a crawlspace

Frequently asked questions

Is a newer apartment building exempt from the survey?

No. Once a building has five or more units, Oregon applies the commercial survey rule, and that rule has no age cutoff.

Who files the DEQ notice?

The person or company doing the abatement files it. DEQ needs the form and fee 10 days ahead of friable work and five days ahead of nonfriable work, and a notice missing either one doesn’t count.

Can residents stay in the building during abatement?

The regulated area is closed to everyone but authorized workers, and friable work stays inside a negative pressure enclosure. How the rest of the building is used during the work is something we settle with the property manager.

Also see asbestos removal in King City, or return to our Tigard page.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (971) 414-4913

Call (971) 414-4913